
01-09-29 Infrastructure 2009 Project
ID:
01-09-29
Originating Department:
Public Works - Engineering Division
Project Contact:
Larry Crowder, Civil Engineer
Pre-Bid Meeting:
NON-MANDATORY, 10:00 A.M., Wednesday, July 8, 2009 Location: Keene Public Works Department, 350 Marlboro Street
Engineer:
Underwood Engineers, Inc.
Due Date / Time:
07/23/2009 - 2:00pm
Notes:
[5] ARRA Project
Status:
Archive
Awarded To:
Park Construction Corp
| Attachment | Size |
|---|---|
| 01-09-29 Advertisement.pdf | 26.71 KB |
| 01-09-29 ARRA CWSRF Environmental Review.pdf | 41.02 KB |
| Keene Wastewater Infrastructure ARRA Fig 1.pdf | 150.2 KB |
| Keene Wastewater Infrastructure ARRA Fig 2.pdf | 798.62 KB |
| 01-09-29 Bidder List as of 07.10.09.pdf | 219.9 KB |
| 01-09-29 Addendum 1.pdf | 2.5 MB |
| 01-09-29 Bid Summary.pdf | 58.92 KB |

Print